HOME CURRENT ISSUE BUYERS GUIDE SUBSCRIBE 2006 ADVERTISING INFO CONTACT THE STAFF


FREE PRODUCT INFO


• • • • • • • • • • • • • • • • • • •

CONTENT CATEGORIES
Ready Mixed
Pipe and Precast
Masonry
Prestressed
Architectural Precast
Cast Stone

Certification
Legislative
Market Forecast
Regulatory

Cementitious Materials
Information Technology
Mix Technology


• • • • • • • • • • • • • • • • • • •

E-MAIL NEWSLETTERS
Subscribe to Concrete Currents


• • • • • • • • • • • • • • • • • • •

RESOURCES
Contact the Staff
Marketplace
2006 Advertising Information


• • • • • • • • • • • • • • • • • • •

RELATED LINKS
Cement Americas
Rock Products
Industry Associations
• • • • • • • • • • • • • • • • • • •








Q/A Archives

October 2006

M T W T F S S
    Nov »
 1
2345678
9101112131415
16171819202122
23242526272829
3031  

Related Experts


Sign-up for RSS

Sign-up for RSS

Plant Architects

Batching and Mixing

sponsored by Plant Architects


SLUMP MAINTAINED AFTER LONG INTERVALS
Posted by PRAJOT from MUMBAI, OT, IN on October 6, 2006

HOW DO WE ATTAIN 120 TO 150 MM SLUMP AT SITES WHICH ARE AT A DISTANCE OF 30 TO 35 KMS FROM THE PLANT WITHOUT SACRIFICING THE STRENGTH & WORKABILITY OF CONCRETE.

The best way to do this is to use a mid-range water reducing agent in the mix at the plant to establish an initial 100mm slump at the plant with the W/C slightly lower than specified. Then on site add a small amount of prescribed high-range water-reducing agent after dosing the small amount of yet-to-be-added water.






 